Skip to content

PRE-ORDER & SAVE $101

See kits

How it works

Sleeve. Post. Panel. Play.

Most setups run about 90 minutes from unboxing to first game.

  1. 01

    Mark out the field

    Pace the usable rectangle and set the footprint. Leave about 2 ft of clearance on each side.

  2. 02

    Set the ground sleeves

    Sleeves go into the ground to anchor everything. No trenches, no concrete, no contractor.

  3. 03

    Drop in the posts

    Posts seat straight into the sleeves at every corner and along each span.

  4. 04

    Attach the walls and play

    4 ft end walls, 2 ft side walls. Panels can be cut down to run around trees, slopes and fence lines.

Audio: on-field play and family conversation. No narration.

Why the walls matter

An open yard punishes every mistake with a walk. Walls turn the same mistake into a rebound, so the ball stays live and the session stays dense. That's the entire idea.

Pick a field

Install gallery

Photography in progress

We're shooting a full install sequence and hardware detail set. These slots are reserved for it.

Install sequence photos

Sleeve → post → wall panel → first game. Four stills or one short clip.

Hardware close-ups

Ground sleeve, post joint, panel connection and top rail detail.

Irregular yard installs

Fields shaped around trees, slopes, fence lines and corners.