How it works
Sleeve. Post. Panel. Play.
Most setups run about 90 minutes from unboxing to first game.
- 01
Mark out the field
Pace the usable rectangle and set the footprint. Leave about 2 ft of clearance on each side.
- 02
Set the ground sleeves
Sleeves go into the ground to anchor everything. No trenches, no concrete, no contractor.
- 03
Drop in the posts
Posts seat straight into the sleeves at every corner and along each span.
- 04
Attach the walls and play
4 ft end walls, 2 ft side walls. Panels can be cut down to run around trees, slopes and fence lines.
Why the walls matter
An open yard punishes every mistake with a walk. Walls turn the same mistake into a rebound, so the ball stays live and the session stays dense. That's the entire idea.
Pick a fieldInstall gallery
Photography in progress
We're shooting a full install sequence and hardware detail set. These slots are reserved for it.
Install sequence photos
Sleeve → post → wall panel → first game. Four stills or one short clip.
Hardware close-ups
Ground sleeve, post joint, panel connection and top rail detail.
Irregular yard installs
Fields shaped around trees, slopes, fence lines and corners.